Skip to content
Send your plot
Row of red-brick houses at dusk
Printed house floor plan with room layouts
Close-up of a house plan drawing

Illustrative stock photos from Pexels. They do not show work by tradespeople reached through this site.

New-build enquiries, plot to keys

Building New Houses Across London

You have the plot and the drawings, or you are close. Send the details and we’ll try to pass them to an independent builder who takes on whole houses: foundations, frame, envelope and fit-out. We don’t build houses ourselves.

Project types

New-build and self-build projects you can ask about

Whether it is a single family house on a garden plot or a pair of homes on a cleared site, the work should be planned around your consent and your budget.

Printed house floor plan with room layouts

Self-build support

You stay in control of the design and choices; the builder takes on the construction and coordinates the trades from slab to handover.

Ask about this for self-build support
Planning conditions

Consent is the start, not the finish

Most new homes come with planning conditions to discharge: materials samples, drainage details, landscaping and more. Keep a list from day one, and make sure your builder works to it, so nothing holds up occupation at the end.

  • Check pre-commencement conditions first
  • Arrange material samples early
  • Gather completion paperwork as the build goes
Printed house floor plan with room layouts
Close-up of a house plan drawing
Plot to keys

How a new-build project runs

What happens to your enquiry, and the stages a new build follows. Each should have a clear finish line before the next one starts.

  1. Send the plot

    Share the area, consent status and drawings. We try to pass them to an independent builder; we can’t promise every enquiry is taken up.

  2. Review & price

    If a builder can help, they look at drawings, consent, ground reports and access, then give a staged quote and a realistic programme.

  3. Groundworks to weathertight

    Foundations, drainage, frame, roof and windows to get the house dry. Your contract is with the builder, not us.

  4. Fit-out and sign-off

    Services, finishes and the Building Control completion certificate, which you should have before the final payment.

What to look for

Signs of a builder suited to whole houses

New-build work needs a different kind of planning from an extension.

Paperwork under control

Conditions, warranties and Building Control should be tracked from the first week.

Tidy, well-run plots

Ask how hoarding, deliveries and waste will be planned with the neighbours in mind.

Built to the drawings

Setting out should be checked so the house sits exactly where consent says.

Decisions at the right time

Ask the builder to flag choices such as windows and kitchen early, so they don’t delay the build.

Programme you can follow

Ask for stage-by-stage updates against the programme.

Check insurance first

Builders work independently of this site, so ask for insurance certificates at quote stage, before work on your plot begins.

Across London

New-home enquiries from every London borough

Send a new-build or self-build enquiry from anywhere in Greater London.

Plots in the capital are often tight, with neighbours close by and limited room for storage, so logistics need planning as carefully as the build itself.

If you have a plot or consent anywhere in London, send the details and we’ll try to pass them to a builder who can review it.

Any plot visit is arranged directly between you and the builder.

Service area →

Tell us about it

Tell us about your plot

Share the area, consent status and drawings if you have them. We’ll try to pass them to an independent builder.

Ready to build your house?

Send your plot details and ask for a staged quote and programme.

Send your plot